This post is to notify you of new lane closures for the SH146 project:
The outside (right) southbound lane on SH146 will be closed between NASA Road 1 to the SH146 Clear Creek bridge (Seabrook/Kemah bridge) from 9:00am to 3:00pm from 2/24/20 to 2/29/20. This closure is to mobilize construction equipment.
10th Street / Shipyard Drive / Waterfront will be fully closed under the SH146 Clear Creek bridge (Seabrook/Kemah bridge) daily through the end of March except Sundays and holidays, from 9:00am to 3:00pm each day. This closure is to create a work zone for bridge widening structural work. Message boards will be placed to assist with directing traffic.
The connector ramp from SH146 SB will be closed to all traffic except to and from the Seabrook Marina & Shipyard.
Traffic on SH146 SB trying to get to 10th Street / Shipyard Drive on the east side of the bridge will be directed eastbound on Main Street in Seabrook, then right on Todville Road.
Traffic on 10th Street / Shipyard Drive on the east side of the bridge trying to get to SH146 SB or the Seabrook Marina and Shipyard will be directed north on Todville Road, then turn left on Main Street in Seabrook, then left at SH146.