This post is to notify you of new lane closures for the SH146 project:
The outside (right) eastbound lane on FM518 will be closed at SH146 from 9:00am to 3:00pm on 7/2/20. This closure is for construction of a bridge foundation.
The outside (right) southbound lane on SH146 will be closed between Capri Lane and 1st Street in Seabrook from 9:00am to 3:00pm on 7/2/20 and from 7/6/20 to 7/10/20. This closure is for delivery of construction materials.
These closures are subject to change if needed due to weather.